Timing Optimization Study of The Pegalongan Bridge Project Using The Fast Track Method and Project Evaluation and Review Technique
Keywords:
Scheduling; Lateness; Optimization; Time; Critical path.Abstract
Scheduling in the Pegalongan Bridge Construction Project in Banyumas Regency uses the S Curve. This method has weaknesses because it does not show activities within a critical time, so it cannot accelerate the work if there is a delay. Due to the project’s late completion, it is necessary to analyze the scheduling with other methods such as PERT and Fast Track methods. This study aims to compare project scheduling between the S Curve method and other methods to obtain an optimal project finish time. In this study, the project scheduling method used is the Fast Track method and the Project Evaluation and Review Technique (PERT). The analysis in this research used the Microsoft Project program as a scheduling tool to get the results of project scheduling comparisons. The results showed a change in the finishing time using the PERT and Fast Track methods. According to the S Curve method, there are many activities, including the critical path, which cause a delay in project completion. Scheduling using the PERT showed an acceleration with fewer critical paths and more optimal 4.0%. On the other hand, the scheduling of the Fast Track showed acceleration from the planned time and was more optimal at 6.1%.
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 AMCS Research Center

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.


