Project Scheduling Analysis of Workers on Environmental Document Development of Rongkong Rongkong River Click Protection using CPM and PERT Methods
Keywords:
Project Scheduling; AMDAL Project; Critical Path Method (CPM); Program Evaluation and Review Technique (PERT).Abstract
PT. Ecotropica Multi Konsultan is a company engaged in environmental consulting and as an element of implementing the procurement of construction work that stores and compiles environmental documents for the protection of the Rongkong river bank, North Luwu Regency. This AMDAL project experienced delays in its implementation, for this reason, this study aims to determine which work is included in the critical path and analyze the network using the CPM (Critical Path Method) method and find out the opportunity for the project to be completed according to the results of acceleration using the method PERT (Programme Evaluation Review Technique). The results of this study can be seen that the implementation of the AMDAL project preparation of environmental documents for the protection of the Rongkong river bank in North Luwu Regency using the CPM method produces 4 critical paths with a processing time of 186 working days 24 days faster than the implementation time of project work in the field for 210 working days. , and using the PERT method it can be seen that the probability of the project being completed in 186 working days is 77.04%.
Published
Issue
Section
License
Copyright (c) 2023 AMCS PRESS

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.