The Effect of Drainage Construction Delay Upon Road Users in Sarawak, Malaysia

Authors

  • Hariz Farhan Mohamad Riduan Universiti Teknologi MARA Cawangan Sarawak, Malaysia
  • Shahril Anwar Mahmud Universiti Teknologi MARA Cawangan Sarawak, Malaysia
  • Nur Izzati Sebri Universiti Teknologi MARA Cawangan Sarawak, Malaysia

Keywords:

Construction delay;, Traffic pollution;, Emotional stress;, Sarawak.

Abstract

The long-delayed drainage upgrading for storm water discharge along Jalan Masjid, Lebuh Java and Jalan Market in the Kuching downtown area in Sarawak, Malaysia has not only caused inconvenience, but also poses significant danger to the road users, business owners and those working in the vicinity.  Originally scheduled for completion in January 2019, the work has only been recently completed.  The paper seeks to examine the effect of the delay upon the livelihood of those who frequented the area.   A semi-structured interview was conducted to gain insight into the experiences of those affected by the delay.  Participants were chosen from the list of people representing a cross-profile of ordinary road users who frequented the road on a daily basis. Three major concerns which appear to cause disturbance to the daily routines of general road users have emerged from the analysis. (1) The long delay of the project has apparently aggravated road congestion, escalated the traffic pollution, and by extension worsened the traffic environment; (2) The repeated flash flood which interfere with the traffic flow; and (3) The emotional stress which the road users have been putting-up during the entire time.  Notwithstanding the limitations, the finding presented in this paper concur with the general public concerns in other construction delay involving public projects.

Published

2022-10-01